How an order moves through the workshop

Five stages from artwork to container, with the checkpoint at each one.

933
product images
59
colourways
572
orderable size variants
30+
export markets

The catalogue currently covers 6 product lines; every figure above is counted from it.

Factory

What we handle in-house

Six things an importer asks before placing a first order — and where each one happens in our own workshop.

  • 01

    In-house stitching

    Cutting, stitching, overlocking and packing all happen under one roof. We do not broker your order to a third-party workshop, so the person who cuts the fabric is the person who answers your email.

  • 02

    Fabric sourcing

    Combed cotton, Tencel, satin and jacquard bought from mills we have worked with for years, so a repeat order lands on the same hand-feel as the first one.

  • 03

    Private label

    Woven and printed labels, hangtags, polybags and cartons produced to your artwork. Artwork files are handled under NDA and returned on request.

  • 04

    Colour matching

    Lab dips against your Pantone reference before bulk. Dye lots from one lot are kept together, so a single order ships as a single shade.

  • 05

    Mixed-carton packing

    Assortment and carton plans built to your size ratio, barcoded and marked so cartons go straight from the container to your store racks.

  • 06

    Export documentation

    Invoices, packing lists, certificates of origin and test reports prepared for your customs broker, in the format your broker asks for.

Factory

Order flow and timing

Indicative durations for a 500-set order after sample approval. Actual dates are confirmed with the order acknowledgement.

  1. 017–10 days

    Artwork and sample

    Printed sample plus a lab dip against your Pantone reference; production starts only after both are signed off.

  2. 023–5 days

    Material and cutting

    Fabric booked, relaxed and cut to your size plan; every panel checked against the approved sample.

  3. 0310–18 days

    Stitching and quilting

    Sewing and quilting in one building, with inline checks while the batch is still open.

  4. 042–3 days

    Final inspection

    AQL inspection; photographed pieces and a measurement report before the carton plan is issued.

  5. 052–4 days

    Packing and documentation

    Cartons built to your size ratio; export documents prepared in your broker’s format.

Durations are working-day estimates and exclude the sample round trip. Peak season and customs inspection can add time; we tell you before it happens, not after.